Electric generating plantEIA plant no. 64021

Alden Solar CSG LLC

Type
Solar Photovoltaic
Nameplate capacity
1.6 MW
Units
1
In service since
2020
Operator
Greenbacker Renewable Energy Corporation
Location
Greeley, Weld County, Colorado
Rated 241st largest in Colorado · 12534th of 14,761 in the U.S. · by nameplate

Alden Solar CSG LLC is a solar power plant in Colorado with a nameplate capacity of 1.6 MW. It generates roughly 3.3k MWh per year — enough to power about 311 average U.S. homes.

Its capacity factor of 23% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Alden Solar CSG LLC could make 14.0k MWh. In 2023 it made 3.3k MWh — the same as running at full power 23 hours in every 100.

Nameplate, full year14.0k MWh1.6 MW × 8,760 hours
Actually generated3.3k MWhEPA eGRID, 2023 · ≈311 homes

Peaking or variableCapacity factor 23%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

SolarBattery Storage

Location

Address31432 Weld County Rd. 51
CityGreeley
CountyWeld County
StateColorado
ZIP80631
Coordinates40.45633, -104.58107
OperatorGreenbacker Renewable Energy Corporation

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
225Solar PhotovoltaicSolar1.6 MWOperating2020

Grid context

NERC RegionWECC
Balancing AuthorityPublic Service Company of Colorado

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Weld County

View all plants in Weld County →

Explore more