Electric generating plantEIA plant no. 58666

Alexander Wind Farm LLC

Type
Onshore Wind Turbine
Nameplate capacity
50.7 MW
Units
1
In service since
2015
Operator
SRIV Partnership LLC
Location
Alexander, Rush County, Kansas
Rated 73rd largest in Kansas · 3912th of 14,761 in the U.S. · by nameplate

Alexander Wind Farm LLC is a wind power plant in Kansas with a nameplate capacity of 50.7 MW. It generates roughly 188.2k MWh per year — enough to power about 17,922 average U.S. homes.

Its capacity factor of 42% puts it in the middle range — running steadily but not full-time.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Alexander Wind Farm LLC could make 444.1k MWh. In 2023 it made 188.2k MWh — the same as running at full power 42 hours in every 100.

Nameplate, full year444.1k MWh50.7 MW × 8,760 hours
Actually generated188.2k MWhEPA eGRID, 2023 · ≈17,922 homes

Mid-meritCapacity factor 42%. It runs much of the time, but not all of it.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

OilWind

Location

Address1474 County Road 120
CityAlexander
CountyRush County
StateKansas
ZIP67513
Coordinates38.42472, -99.50750
OperatorSRIV Partnership LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
1Onshore Wind TurbineWind50.7 MWOperating2015

Grid context

NERC RegionMRO
Balancing AuthoritySouthwest Power Pool

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Rush County

View all plants in Rush County →