Electric generating plantEIA plant no. 64227

Alexis Solar, LLC

Type
Solar Photovoltaic
Nameplate capacity
10.0 MW
Units
1
In service since
2019
Operator
Sol Systems
Location
Encino, Brooks County, Texas
Rated 727th largest in Texas · 6054th of 14,761 in the U.S. · by nameplate

Alexis Solar, LLC is a solar power plant in Texas with a nameplate capacity of 10.0 MW. It generates roughly 17.4k MWh per year — enough to power about 1,654 average U.S. homes.

Its capacity factor of 20% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Alexis Solar, LLC could make 87.6k MWh. In 2023 it made 17.4k MWh — the same as running at full power 20 hours in every 100.

Nameplate, full year87.6k MWh10.0 MW × 8,760 hours
Actually generated17.4k MWhEPA eGRID, 2023 · ≈1,654 homes

Peaking or variableCapacity factor 20%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

SolarBattery Storage

Location

Address1229 Fm 755
CityEncino
CountyBrooks County
StateTexas
ZIP78353
Coordinates26.88913, -98.23332
OperatorSol Systems

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
12001Solar PhotovoltaicSolar10.0 MWOperating2019

Grid context

NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc.

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Brooks County