Electric generating plantEIA plant no. 62546

Almond

Type
Solar Photovoltaic
Nameplate capacity
19.9 MW
Units
1
In service since
2023
Operator
Westlands Almond LLC
Location
Lemoore, Kings County, California
Rated 730th largest in California · 5238th of 14,761 in the U.S. · by nameplate

Almond is a solar power plant in California with a nameplate capacity of 19.9 MW. It generates roughly 9.6k MWh per year — enough to power about 910 average U.S. homes.

Its capacity factor of 5% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Almond could make 174.3k MWh. In 2023 it made 9.6k MWh — the same as running at full power 5 hours in every 100.

Nameplate, full year174.3k MWh19.9 MW × 8,760 hours
Actually generated9.6k MWhEPA eGRID, 2023 · ≈910 homes

Peaking or variableCapacity factor 5%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBiomassBattery Storage

Location

AddressAvenal Cutoff Road at 25th Ave
CityLemoore
CountyKings County
StateCalifornia
ZIP93245
Coordinates36.21222, -119.91000
OperatorWestlands Almond LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
ALMNDSolar PhotovoltaicSolar19.9 MWOperating2023

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Kings County

View all plants in Kings County →

Explore more