Altavista Solar is a solar power plant in Virginia with a nameplate capacity of 80.0 MW. It generates roughly 168.9k MWh per year — enough to power about 16,084 average U.S. homes.
Its capacity factor of 24% reflects intermittent or peaking operation.
Run flat out every hour of the year, Altavista Solar could make 700.8k MWh. In 2023 it made 168.9k MWh — the same as running at full power 24 hours in every 100.
Peaking or variableCapacity factor 24%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 3935 Bedford Hwy |
|---|---|
| City | Lynch Station |
| County | Campbell County |
| State | Virginia |
| ZIP | 24571 |
| Coordinates | 37.14820, -79.34750 |
| Operator | Altavista Solar, LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| ATLA | Solar Photovoltaic | Solar | 80.0 MW | Operating | 2021 |
| NERC Region | RFC |
|---|---|
| Balancing Authority | PJM Interconnection, LLC |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.