Ameresco HCE Solar LLC is a solar power plant in Colorado with a nameplate capacity of 4.5 MW. It generates roughly 2.7k MWh per year — enough to power about 254 average U.S. homes.
Its capacity factor of 3% reflects intermittent or peaking operation.
Run flat out every hour of the year, Ameresco HCE Solar LLC could make 90.2k MWh. In 2023 it made 2.7k MWh — the same as running at full power 3 hours in every 100.
In 2023 its nameplate was 10.3 MW (EPA eGRID). EIA's current inventory (EIA-860M) lists 4.5 MW operating.
Peaking or variableCapacity factor 3%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | County Road 114 |
|---|---|
| City | Glenwood Springs |
| County | Garfield County |
| State | Colorado |
| ZIP | 81601 |
| Coordinates | 39.46647, -107.23477 |
| Operator | Ameresco HCE Solar LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| HCEPV | Solar Photovoltaic | Solar | 4.5 MW | Operating | 2023 |
| NERC Region | WECC |
|---|---|
| Balancing Authority | Public Service Company of Colorado |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.