Electric generating plantEIA plant no. 59516

American Legion PV 1

Type
Solar Photovoltaic
Nameplate capacity
16.0 MW
Units
1
In service since
2017
Operator
Strata Manager, LLC
Location
Roanoke Rapids, Halifax County, North Carolina
Rated 146th largest in North Carolina · 5457th of 14,761 in the U.S. · by nameplate

American Legion PV 1 is a solar power plant in North Carolina with a nameplate capacity of 16.0 MW. It generates roughly 24.5k MWh per year — enough to power about 2,331 average U.S. homes.

Its capacity factor of 17% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, American Legion PV 1 could make 140.2k MWh. In 2023 it made 24.5k MWh — the same as running at full power 17 hours in every 100.

Nameplate, full year140.2k MWh16.0 MW × 8,760 hours
Actually generated24.5k MWhEPA eGRID, 2023 · ≈2,331 homes

Peaking or variableCapacity factor 17%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

OilHydroelectricSolarBiomassBattery Storage

Location

Address508 American Legion Road
CityRoanoke Rapids
CountyHalifax County
StateNorth Carolina
ZIP27870
Coordinates36.41833, -77.65583
OperatorStrata Manager, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
AMLEGSolar PhotovoltaicSolar16.0 MWOperating2017

Ownership

OwnerLocationShare
Fresh Air Energy XIX, LLCSan Francisco, CA10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionSERC
Balancing AuthorityPJM Interconnection, LLC

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Halifax County