AOC, Capitol Power Plant is a natural gas power plant in District of Columbia with a nameplate capacity of 7.5 MW. It generates roughly 49.4k MWh per year — enough to power about 4,705 average U.S. homes.
Its capacity factor of 75% puts it in the middle range — running steadily but not full-time. At 1190 lb CO₂/MWh, its emission rate sits above the national grid average of roughly 800 lb/MWh.
Run flat out every hour of the year, AOC, Capitol Power Plant could make 65.7k MWh. In 2023 it made 49.4k MWh — the same as running at full power 75 hours in every 100.
Mid-meritCapacity factor 75%. It runs much of the time, but not all of it.
How it works
Why the numbers look like this: a combustion turbine can go from cold to full power in well under an hour, often minutes, so grid operators call on these plants for the few hottest or coldest hours of the year. A low capacity factor here is the job description, not a failure.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 25 E St. SE |
|---|---|
| City | Washington |
| County | District of Columbia County |
| State | District of Columbia |
| ZIP | 20003 |
| Coordinates | 38.88270, -77.00744 |
| Operator | Architect of the Capitol, Capitol Power Plant |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| CTG1 | Natural Gas Fired Combustion Turbine | Natural Gas | 7.5 MW | Operating | 2018 |
| CO₂ | 29.4k metric tons |
|---|---|
| SO₂ | 1 metric tons |
| NOₓ | 81 metric tons |
| CO₂ Rate | 1190 lb/MWh |
Annual totals and CO₂ rate reported by EPA eGRID for 2023. Reference averages are approximate U.S.-wide figures from the same dataset.
| NERC Region | RFC |
|---|---|
| Balancing Authority | PJM Interconnection, LLC |
Natural gas plants are the workhorse of the modern grid. Combined-cycle units achieve very high efficiency and can ramp up and down quickly to balance variable renewables. They emit roughly half the CO₂ per MWh of coal and far less of other pollutants, but they still release upstream methane during fuel extraction.
| Data center | Distance |
|---|---|
| CoreSite DC1 | 1.8 mi |
| Lumen McLean 1 | 11.3 mi |
| Lumen McLean | 11.3 mi |
| DataBank IAD2 | 11.4 mi |
| Equinix DC7 | 11.6 mi |
| 8100 Boone Boulevard | 11.9 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map