Electric generating plantEIA plant no. 54316

Archer Daniels Midland Southport

Type
Natural Gas Fired Combustion Turbine
Nameplate capacity
52.5 MW
Units
3
In service since
1992–1995
Operator
Archer Daniels Midland Co
Location
Southport, Brunswick County, North Carolina
Rated 75th largest in North Carolina · 3862nd of 14,761 in the U.S. · by nameplate

Archer Daniels Midland Southport is a natural gas power plant in North Carolina with a nameplate capacity of 52.5 MW.

The 52.5 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A combustion turbine (“peaker”) burning natural gas

airnatural gas1compressor squeezes air2fuel burns3hot gas spins turbine4generator
  1. A compressor at the front squeezes outside air.
  2. natural gas burns in that compressed air.
  3. The hot, expanding gas spins the turbine — the same idea as a jet engine.
  4. The turbine turns a generator; exhaust leaves through the stack.

Why the numbers look like this: a combustion turbine can go from cold to full power in well under an hour, often minutes, so grid operators call on these plants for the few hottest or coldest hours of the year. A low capacity factor here is the job description, not a failure.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

NuclearNatural GasSolarBattery Storage

Location

Address1730 E Moore St SE
CitySouthport
CountyBrunswick County
StateNorth Carolina
ZIP28461
Coordinates33.93970, -77.99050
OperatorArcher Daniels Midland Co

Generators (3)

IDTechnologyFuelNameplate capacityStatusOnline
GEN1Natural Gas Fired Combustion TurbineNatural Gas18.0 MWStandby1992
GEN2Natural Gas Fired Combustion TurbineNatural Gas17.5 MWStandby1992
GEN3Natural Gas Fired Combustion TurbineNatural Gas17.0 MWStandby1995

Grid context

NERC RegionSERC
Balancing AuthorityDuke Energy Progress East

About Natural Gas plants

Natural gas plants are the workhorse of the modern grid. Combined-cycle units achieve very high efficiency and can ramp up and down quickly to balance variable renewables. They emit roughly half the CO₂ per MWh of coal and far less of other pollutants, but they still release upstream methane during fuel extraction.