Aurora County Wind is a wind power plant in South Dakota with a nameplate capacity of 20.0 MW. It generates roughly 70.8k MWh per year — enough to power about 6,747 average U.S. homes.
Its capacity factor of 40% puts it in the middle range — running steadily but not full-time.
Run flat out every hour of the year, Aurora County Wind could make 175.2k MWh. In 2023 it made 70.8k MWh — the same as running at full power 40 hours in every 100.
Mid-meritCapacity factor 40%. It runs much of the time, but not all of it.
How it works
Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 37158 US Hwy. 16 |
|---|---|
| City | White Lake |
| County | Aurora County |
| State | South Dakota |
| ZIP | 57833 |
| Coordinates | 43.73083, -98.76417 |
| Operator | RWE Clean Energy |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| ACSD | Onshore Wind Turbine | Wind | 20.0 MW | Operating | 2018 |
| NERC Region | MRO |
|---|---|
| Balancing Authority | Southwest Power Pool |
Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.