Electric generating plantEIA plant no. 68433

Banner Solar Ironwood

Type
Solar Photovoltaic
Nameplate capacity
1.4 MW
Units
1
In service since
2021
Operator
Banner Solar Ironwood LLC
Location
Queen Creek, Pinal County, Arizona
Rated 191st largest in Arizona · 13098th of 14,761 in the U.S. · by nameplate

Banner Solar Ironwood is a solar power plant in Arizona with a nameplate capacity of 1.4 MW.

The 1.4 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBattery Storage

Location

Address37000 Gantzel Rd
CityQueen Creek
CountyPinal County
StateArizona
ZIP85140
Coordinates33.21314, -111.56690
OperatorBanner Solar Ironwood LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
4761Solar PhotovoltaicSolar1.4 MWOperating2021

Grid context

NERC RegionWECC
Balancing AuthorityArizona Public Service Company

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Pinal County

View all plants in Pinal County →

Data centers near Banner Solar Ironwood

Data centerOperatorDistance
L3Harris Technologies IncNot recorded8.8 mi
AZ LabsNot recorded8.8 mi
Apple Data CenterApple Inc.9.5 mi
EdgeCoreNot recorded9.6 mi
Data center, MesaNot recorded9.9 mi
Data center, MesaNot recorded9.9 mi
Data center, MesaNot recorded10.0 mi
ComarchNot recorded10.7 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more