Ben Moreell Solar Farm is a solar power plant in New Jersey with a nameplate capacity of 20.0 MW. It generates roughly 34.5k MWh per year — enough to power about 3,282 average U.S. homes.
Its capacity factor of 20% reflects intermittent or peaking operation.
Run flat out every hour of the year, Ben Moreell Solar Farm could make 175.2k MWh. In 2023 it made 34.5k MWh — the same as running at full power 20 hours in every 100.
Peaking or variableCapacity factor 20%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 199 Hamilton Road |
|---|---|
| City | Tinton Falls |
| County | Monmouth County |
| State | New Jersey |
| ZIP | 07701 |
| Coordinates | 40.28000, -74.10000 |
| Operator | MN8 Energy LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| BMSF | Solar Photovoltaic | Solar | 20.0 MW | Operating | 2020 |
| Owner | Location | Share |
|---|---|---|
| Ben Moreell Solar Farm, LLC | Boca Raton, FL | 10000.0% |
Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.
| NERC Region | RFC |
|---|---|
| Balancing Authority | PJM Interconnection, LLC |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.