Electric generating plantEIA plant no. 63384

Bennington Wind

Type
Onshore Wind Turbine
Nameplate capacity
93.0 MW
Units
1
In service since
2021
Operator
Minonk Stewardship Wind LLC
Location
Minonk, Marshall County, Illinois
Rated 115th largest in Illinois · 2964th of 14,761 in the U.S. · by nameplate

Bennington Wind is a wind power plant in Illinois with a nameplate capacity of 93.0 MW. It generates roughly 331.3k MWh per year — enough to power about 31,552 average U.S. homes.

Its capacity factor of 41% puts it in the middle range — running steadily but not full-time.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Bennington Wind could make 814.7k MWh. In 2023 it made 331.3k MWh — the same as running at full power 41 hours in every 100.

Nameplate, full year814.7k MWh93.0 MW × 8,760 hours
Actually generated331.3k MWhEPA eGRID, 2023 · ≈31,552 homes

Mid-meritCapacity factor 41%. It runs much of the time, but not all of it.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

WindSolarBiomass

Location

AddressCounty Road 2900e
CityMinonk
CountyMarshall County
StateIllinois
ZIP61760
Coordinates40.96038, -89.08536
OperatorMinonk Stewardship Wind LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
BENNOnshore Wind TurbineWind93.0 MWOperating2021

Grid context

NERC RegionSERC
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc..

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.