Electric generating plantEIA plant no. 56968

Big Top LLC

Type
Onshore Wind Turbine
Nameplate capacity
1.7 MW
Units
1
In service since
2009
Operator
CR51 Inc.
Location
Echo, Morrow County, Oregon
Rated 278th largest in Oregon · 12458th of 14,761 in the U.S. · by nameplate

Big Top LLC is a wind power plant in Oregon with a nameplate capacity of 1.7 MW. It generates roughly 3.2k MWh per year — enough to power about 304 average U.S. homes.

Its capacity factor of 21% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Big Top LLC could make 14.9k MWh. In 2023 it made 3.2k MWh — the same as running at full power 21 hours in every 100.

Nameplate, full year14.9k MWh1.7 MW × 8,760 hours
Actually generated3.2k MWhEPA eGRID, 2023 · ≈304 homes

Peaking or variableCapacity factor 21%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricWindSolarBiomass

Location

Address28821 Madison Road
CityEcho
CountyMorrow County
StateOregon
ZIP97826
Coordinates45.65500, -119.46470
OperatorCR51 Inc.

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
1Onshore Wind TurbineWind1.7 MWOperating2009

Ownership

OwnerLocationShare
Big Top, LLCEcho, OR10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionWECC
Balancing AuthorityPacifiCorp - West

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Morrow County

View all plants in Morrow County →

Data centers near Big Top LLC

Data centerOperatorDistance
Amazon Web Services data center, HermistonAmazon Web Services11.0 mi
Amazon Web Services data center, HermistonAmazon Web Services14.2 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more