Bird Dog Solar

☀ SolarIPP Non-CHP40 MW capacity

103rd largest plant in Georgia · 3890th nationally

Bird Dog Solar is a solar power plant in Georgia with a nameplate capacity of 40.0 MW. It generates roughly 3.5k MWh per year — enough to power about 334 average U.S. homes.

Its capacity factor of 1% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%1%
Peaking — intermittent or backup
Capacity40 MWnameplate
Annual Generation3.5k MWhEPA eGRID
Capacity Factor1%of theoretical max
Annual CO₂metric tons

Location

Plant NameBird Dog Solar
OperatorBird Dog Solar, Llc
CityWaynesboro
CountyBurke County
StateGeorgia
ZIP30830
Coordinates33.12656, -81.99937

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

NuclearNatural GasOilHydroelectricSolarBiomass

Generators (1)

IDTechnologyFuelCapacityStatusOnline
GA-01Solar PhotovoltaicSolar40.0 MWOperating2023

Grid context

NERC RegionSERC
Balancing AuthoritySouthern Company Services, Inc. - Trans

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Burke County

View all plants in Burke County →