Electric generating plantEIA plant no. 66571

BKV-BPP Ponder Solar

Type
Solar Photovoltaic
Nameplate capacity
2.5 MW
Units
1
In service since
2024
Operator
PPM Solar LLC
Location
Ponder, Denton County, Texas
Rated 949th largest in Texas · 10573rd of 14,761 in the U.S. · by nameplate

BKV-BPP Ponder Solar is a solar power plant in Texas with a nameplate capacity of 2.5 MW.

The 2.5 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilHydroelectricSolarBiomassBattery Storage

Location

Address4285 Florance Road
CityPonder
CountyDenton County
StateTexas
ZIP76259
Coordinates33.15577, -97.25464
OperatorPPM Solar LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
BKVP1Solar PhotovoltaicSolar2.5 MWOperating2024

Ownership

OwnerLocationShare
BKV Barnett, LLCBridgeport, TX10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc.

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Denton County

View all plants in Denton County →

Data centers near BKV-BPP Ponder Solar

Data centerOperatorDistance
CITIGROUP TECHNOLOGY INCNot recorded10.3 mi
Charles Schwab Data CenterNot recorded10.5 mi
QTS Data CenterQuality Technology Services11.5 mi
Facebook Fort Worth DatacenterMeta11.7 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more