Blackwater River Solar Energy Center is a solar power plant in Florida with a nameplate capacity of 149 MW. It generates roughly 113.8k MWh per year — enough to power about 10,835 average U.S. homes.
Its capacity factor of 17% reflects intermittent or peaking operation.
Run flat out every hour of the year, Blackwater River Solar Energy Center could make 652.6k MWh. In 2023 it made 113.8k MWh — the same as running at full power 17 hours in every 100.
In 2023 its nameplate was 74.5 MW (EPA eGRID). EIA's current inventory (EIA-860M) lists 149 MW operating.
Peaking or variableCapacity factor 17%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 9156 Highway 90 |
|---|---|
| City | Milton |
| County | Santa Rosa County |
| State | Florida |
| ZIP | 32583 |
| Coordinates | 30.64691, -86.93821 |
| Operator | Florida Power & Light Co |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| 1 | Solar Photovoltaic | Solar | 74.5 MW | Operating | 2023 |
| 2 | Batteries | Battery | 74.5 MW | Operating | 2025 |
| NERC Region | SERC |
|---|---|
| Balancing Authority | Florida Power & Light Company |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.