Electric generating plantEIA plant no. 69235

Blairs Valley Solar Project

Type
Solar Photovoltaic
Nameplate capacity
20.0 MW
Units
1
In service since
2025
Operator
CleanChoice Energy
Location
Mercersburg, Franklin County, Pennsylvania
Rated 136th largest in Pennsylvania · 4971st of 14,761 in the U.S. · by nameplate

Blairs Valley Solar Project is a solar power plant in Pennsylvania with a nameplate capacity of 20.0 MW.

The 20.0 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBiomass

Location

Address8961 Blue Spring Rd
CityMercersburg
CountyFranklin County
StatePennsylvania
ZIP17236
Coordinates39.80340, -77.92160
OperatorCleanChoice Energy

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
BVCCESolar PhotovoltaicSolar20.0 MWOperating2025

Ownership

OwnerLocationShare
CCE Genco, LLCWashington, DC5100.0%
Churchill Stateside Renewable Energy Fund XXXIV, LLC?Clearwater, FL4900.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionRFC
Balancing AuthorityPJM Interconnection, LLC

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Franklin County

View all plants in Franklin County →

Data centers near Blairs Valley Solar Project

Data centerOperatorDistance
Morgan WirelessNot recorded20.1 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more