Blue Summit Ii Wind

🌬 WindIPP Non-CHP99 MW capacity

491st largest plant in Texas · 2580th nationally

Blue Summit Ii Wind is a wind power plant in Texas with a nameplate capacity of 99.4 MW. It generates roughly 366.2k MWh per year — enough to power about 34,872 average U.S. homes.

Its capacity factor of 42% puts it in the middle range — running steadily but not full-time.

PeakingMid-meritBaseload0%40%80%100%42%
Mid-merit — steady but not full-time
Capacity99 MWnameplate
Annual Generation366.2k MWhEPA eGRID
Capacity Factor42%of theoretical max
Annual CO₂metric tons

Location

Plant NameBlue Summit Ii Wind
OperatorBlue Summit Ii Wind, Llc
CityVernon
CountyWilbarger County
StateTexas
ZIP76384
Coordinates34.22588, -99.47799

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

WindSolarBattery Storage

Generators (1)

IDTechnologyFuelCapacityStatusOnline
BSIIOnshore Wind TurbineWind99.4 MWOperating2019

Grid context

NERC RegionTRE
Balancing AuthorityElectric Reliability Council Of Texas, Inc.