Bob Wiley Detention Center

☀ SolarIPP Non-CHP1 MW capacity

1419th largest plant in California · 11275th nationally

Bob Wiley Detention Center is a solar power plant in California with a nameplate capacity of 1.8 MW.

Capacity2 MWnameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameBob Wiley Detention Center
OperatorSocore Energy Llc
CityVisalia
CountyTulare County
StateCalifornia
ZIP93291
Coordinates36.45400, -119.31200

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBiomassBattery Storage

Generators (1)

IDTechnologyFuelCapacityStatusOnline
PV1Solar PhotovoltaicSolar1.8 MWOperating2020

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Tulare County

View all plants in Tulare County →

Explore more