Boulder Solar Ii, Llc

☀ SolarIPP Non-CHP50 MW capacity

55th largest plant in Nevada · 3575th nationally

Boulder Solar Ii, Llc is a solar power plant in Nevada with a nameplate capacity of 50.0 MW. It generates roughly 126.0k MWh per year — enough to power about 12,001 average U.S. homes.

Its capacity factor of 29% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%29%
Peaking — intermittent or backup
Capacity50 MWnameplate
Annual Generation126.0k MWhEPA eGRID
Capacity Factor29%of theoretical max
Annual CO₂metric tons

Location

Plant NameBoulder Solar Ii, Llc
OperatorInvenergy Services Llc
CityBoulder City
CountyClark County
StateNevada
ZIP89005
Coordinates35.85000, -114.94400

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBattery Storage

Generators (1)

IDTechnologyFuelCapacityStatusOnline
BSIISolar PhotovoltaicSolar50.0 MWOperating2017

Grid context

NERC RegionWECC
Balancing AuthorityNevada Power Company

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Clark County

View all plants in Clark County →

Explore more