Electric generating plantEIA plant no. 58680

Braley Road 2

Type
Solar Photovoltaic
Nameplate capacity
2.6 MW
Units
1
In service since
2015
Operator
Mass Solar, LLC
Location
Freetown, Bristol County, Massachusetts
Rated 364th largest in Massachusetts · 10508th of 14,761 in the U.S. · by nameplate

Braley Road 2 is a solar power plant in Massachusetts with a nameplate capacity of 2.6 MW. It generates roughly 2.0k MWh per year — enough to power about 186 average U.S. homes.

Its capacity factor of 9% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Braley Road 2 could make 22.8k MWh. In 2023 it made 2.0k MWh — the same as running at full power 9 hours in every 100.

Nameplate, full year22.8k MWh2.6 MW × 8,760 hours
Actually generated2.0k MWhEPA eGRID, 2023 · ≈186 homes

Peaking or variableCapacity factor 9%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBiomassBattery Storage

Location

AddressBraley Road
CityFreetown
CountyBristol County
StateMassachusetts
ZIP02717
Coordinates41.75167, -70.96694
OperatorMass Solar, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
PV1Solar PhotovoltaicSolar2.6 MWOperating2015

Grid context

NERC RegionNPCC
Balancing AuthorityISO New England Inc.

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.