Electric generating plantEIA plant no. 58994

Breckinridge Wind Project LLC

Type
Onshore Wind Turbine
Nameplate capacity
98.8 MW
Units
1
In service since
2015
Operator
NextEra Energy Resources Breckinridge
Location
Enid, Garfield County, Oklahoma
Rated 103rd largest in Oklahoma · 2896th of 14,761 in the U.S. · by nameplate

Breckinridge Wind Project LLC is a wind power plant in Oklahoma with a nameplate capacity of 98.8 MW. It generates roughly 364.9k MWh per year — enough to power about 34,751 average U.S. homes.

Its capacity factor of 42% puts it in the middle range — running steadily but not full-time.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Breckinridge Wind Project LLC could make 865.5k MWh. In 2023 it made 364.9k MWh — the same as running at full power 42 hours in every 100.

Nameplate, full year865.5k MWh98.8 MW × 8,760 hours
Actually generated364.9k MWhEPA eGRID, 2023 · ≈34,751 homes

Mid-meritCapacity factor 42%. It runs much of the time, but not all of it.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

WindSolarBattery Storage

Location

Address13113 East Phillips Ave
CityEnid
CountyGarfield County
StateOklahoma
ZIP73701
Coordinates36.47694, -97.68556
OperatorNextEra Energy Resources Breckinridge

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
BWPOnshore Wind TurbineWind98.8 MWOperating2015

Grid context

NERC RegionMRO
Balancing AuthoritySouthwest Power Pool

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Garfield County

View all plants in Garfield County →

Explore more