Bristol Landfill Solar

☀ SolarIPP Non-CHP5 MW capacity

32nd largest plant in Rhode Island · 6987th nationally

Bristol Landfill Solar is a solar power plant in Rhode Island with a nameplate capacity of 5.0 MW.

Capacity5 MWnameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameBristol Landfill Solar
OperatorNugen Capital Management
CityBristol
CountyBristol County
StateRhode Island
ZIP02809
Coordinates41.72763, -71.28849

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasWindSolar

Generators (1)

IDTechnologyFuelCapacityStatusOnline
BL1Solar PhotovoltaicSolar5.0 MWOperating2024

Grid context

NERC RegionNPCC
Balancing AuthorityIso New England Inc.

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Bristol County

View all plants in Bristol County →