Electric generating plantEIA plant no. 67305

Bromley Battery Storage

Type
Batteries
Nameplate capacity
11.8 MW
Units
1
In service since
2024
Operator
Bromley Energy Storage LLC
Location
Brighton, Adams County, Colorado
Rated 108th largest in Colorado · 5854th of 14,761 in the U.S. · by nameplate

Bromley Battery Storage is a battery storage power plant in Colorado with a nameplate capacity of 11.8 MW.

The 11.8 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A battery storage site

charge middaydischarge evening1battery containers2inverters, both ways3the grid
  1. Rows of shipping-container-sized battery racks store electricity chemically.
  2. Inverters charge them from the grid — often midday, when solar is plentiful and cheap.
  3. In the evening peak the same inverters run the other way and send power back.

Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBiomassBattery Storage

Location

Address18875 E. Bromley Lane,
CityBrighton
CountyAdams County
StateColorado
ZIP80601
Coordinates39.97877, -104.76868
OperatorBromley Energy Storage LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
BROBABatteriesBattery11.8 MWOperating2024

Ownership

OwnerLocationShare
AmerescoKnoxville, TN10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionWECC
Balancing AuthorityWestern Area Power Administration - Rocky Mountain Region

About Battery Storage plants

Battery storage facilities don't generate electricity — they store it. They charge from the grid (often from solar during the day) and discharge during peak demand or to firm up renewables. EIA classifies them as power plants because they connect to the grid like one.

Other plants in Adams County

View all plants in Adams County →

Explore more