Electric generating plantEIA plant no. 7927

Buffalo Mountain

Type
Onshore Wind Turbine
Status
Retired November 2021
Nameplate (when running)
1.8 MW
Units
3
In service since
2000
Operator
Tennessee Valley Authority
Location
Oliver Springs, Anderson County, Tennessee

Buffalo Mountain is retired. EIA's monthly generator inventory (EIA-860M, September 2026) lists every generator at this wind plant as retired; the last one retired in November 2021. It is not counted among Tennessee's operating plants or in any ranking on this site.

The figures below describe the plant when it ran: equipment from EIA Form 860 (2025).

The 1.8 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasCoalHydroelectricWind

Location

Address1980 Windrock Rd
CityOliver Springs
CountyAnderson County
StateTennessee
ZIP37840
Coordinates36.12099, -84.33873
OperatorTennessee Valley Authority

Generators (3)

IDTechnologyFuelNameplate capacityStatusOnline
1Onshore Wind TurbineWind0.6 MWRetired2000
2Onshore Wind TurbineWind0.6 MWRetired2000
3Onshore Wind TurbineWind0.6 MWRetired2000

Grid context

NERC RegionSERC
Balancing AuthorityTennessee Valley Authority