Electric generating plantEIA plant no. 67968

Burksol Energy Storage

Type
Batteries
Nameplate capacity
100 MW
Units
1
In service since
2025
Operator
Burksol, LLC
Location
Afton, Dickens County, Texas
Rated 547th largest in Texas · 2729th of 14,761 in the U.S. · by nameplate

Burksol Energy Storage is a battery storage power plant in Texas with a nameplate capacity of 100 MW.

The 100 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A battery storage site

charge middaydischarge evening1battery containers2inverters, both ways3the grid
  1. Rows of shipping-container-sized battery racks store electricity chemically.
  2. Inverters charge them from the grid — often midday, when solar is plentiful and cheap.
  3. In the evening peak the same inverters run the other way and send power back.

Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

WindSolarBattery Storage

Location

Address931 County Road 112
CityAfton
CountyDickens County
StateTexas
ZIP79220
Coordinates33.78151, -100.87750
OperatorBurksol, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
BESBatteriesBattery100 MWOperating2025

Grid context

NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc.

About Battery Storage plants

Battery storage facilities don't generate electricity — they store it. They charge from the grid (often from solar during the day) and discharge during peak demand or to firm up renewables. EIA classifies them as power plants because they connect to the grid like one.

Other plants in Dickens County

View all plants in Dickens County →

Data centers near Burksol Energy Storage

Data centerOperatorDistance
Argo Data Center under constructionNot recorded0.6 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more