Electric generating plantEIA plant no. 69408

Burlingame Solar Community Solar

Type
Solar Photovoltaic
Nameplate capacity
2.1 MW
Units
1
In service since
2025
Operator
Burlingame Solar, LLC
Location
Brownsville, Linn County, Oregon
Rated 257th largest in Oregon · 11053rd of 14,761 in the U.S. · by nameplate

Burlingame Solar Community Solar is a solar power plant in Oregon with a nameplate capacity of 2.1 MW.

The 2.1 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBiomass

Location

Address34336 Hwy 228
CityBrownsville
CountyLinn County
StateOregon
ZIP97327
Coordinates44.38784, -123.01261
OperatorBurlingame Solar, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
BGSolar PhotovoltaicSolar2.1 MWOperating2025

Grid context

NERC RegionWECC
Balancing AuthorityPacifiCorp - West

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Linn County

View all plants in Linn County →

Data centers near Burlingame Solar Community Solar

Data centerOperatorDistance
Date Center West - EugeneData Center West, Inc.23.6 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map