Ca - Ventura Co Ccd - Moorpark College

☀ SolarIPP Non-CHP2 MW capacity

1258th largest plant in California · 9695th nationally

Ca - Ventura Co Ccd - Moorpark College is a solar power plant in California with a nameplate capacity of 2.6 MW. It generates roughly 1.8k MWh per year — enough to power about 173 average U.S. homes.

Its capacity factor of 8% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%8%
Peaking — intermittent or backup
Capacity3 MWnameplate
Annual Generation1.8k MWhEPA eGRID
Capacity Factor8%of theoretical max
Annual CO₂metric tons

Location

Plant NameCa - Ventura Co Ccd - Moorpark College
OperatorForefront Power, Llc
CityMoorpark
CountyVentura County
StateCalifornia
ZIP93021
Coordinates34.29972, -118.83346

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBiomassBattery Storage

Generators (1)

IDTechnologyFuelCapacityStatusOnline
17024Solar PhotovoltaicSolar2.6 MWOperating2023

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Ventura County

View all plants in Ventura County →

Explore more