CA - Ventura Co CCD - Moorpark College is a solar power plant in California with a nameplate capacity of 2.6 MW. It generates roughly 1.8k MWh per year — enough to power about 173 average U.S. homes.
Its capacity factor of 8% reflects intermittent or peaking operation.
Run flat out every hour of the year, CA - Ventura Co CCD - Moorpark College could make 22.8k MWh. In 2023 it made 1.8k MWh — the same as running at full power 8 hours in every 100.
Peaking or variableCapacity factor 8%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 7075 Campus Rd |
|---|---|
| City | Moorpark |
| County | Ventura County |
| State | California |
| ZIP | 93021 |
| Coordinates | 34.29972, -118.83346 |
| Operator | Forefront Power, LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| 17024 | Solar Photovoltaic | Solar | 2.6 MW | Operating | 2023 |
| NERC Region | WECC |
|---|---|
| Balancing Authority | California Independent System Operator |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.