Electric generating plantEIA plant no. 66338

Callisto I Energy Center

Type
Batteries
Nameplate capacity
223 MW
Units
1
In service since
2024
Operator
Callisto I Energy Center
Location
Houston, Harris County, Texas
Rated 275th largest in Texas · 1443rd of 14,761 in the U.S. · by nameplate

Callisto I Energy Center is a battery storage power plant in Texas with a nameplate capacity of 223 MW.

The 223 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A battery storage site

charge middaydischarge evening1battery containers2inverters, both ways3the grid
  1. Rows of shipping-container-sized battery racks store electricity chemically.
  2. Inverters charge them from the grid — often midday, when solar is plentiful and cheap.
  3. In the evening peak the same inverters run the other way and send power back.

Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilBattery Storage

Location

Address12100 Hiram Clarke Rd
CityHouston
CountyHarris County
StateTexas
ZIP77045
Coordinates29.64681, -95.45054
OperatorCallisto I Energy Center

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
CALL1BatteriesBattery223 MWOperating2024

Grid context

NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc.

About Battery Storage plants

Battery storage facilities don't generate electricity — they store it. They charge from the grid (often from solar during the day) and discharge during peak demand or to firm up renewables. EIA classifies them as power plants because they connect to the grid like one.

Other plants in Harris County

View all plants in Harris County →

Data centers near Callisto I Energy Center

Data centerOperatorDistance
Rice Data CenterNot recorded0.9 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more