Weld, Colorado · Plant code 67466

CBEP Solar 4, LLC

CBEP Solar 4, LLC is a solar plant in Weld, Colorado. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

Primary fuel Solar

Route-friendly label and badge.

Total capacity 4 MW

Plant nameplate capacity.

Annual generation 7,942 MWh

Annual output from imported EIA and EPA records.

Capacity factor 23%

A simple way to compare utilization.

Operations

Operations details

Sector IPP Non-CHP

Utility, IPP, industrial, or commercial style ownership.

Status Operating

Current operating status in the imported records.

Online year 2,023

Useful for technology-vintage context.

Location Milliken, Colorado

County and state routing anchor.

Emissions

Emissions details

CO2 0 tons

Annual plant-level total.

SO2 0 tons

Annual sulfur dioxide.

NOx 0 tons

Annual nitrogen oxides.

CO2 rate 0 lbs/MWh

Emission intensity, when available.

Fuel mix

Generation by fuel at the site.

Solar 7,942 MWh · 100% of generation

Ownership

Who owns the plant.

Owner Green Street Power Partners

100%

Generators

Generator-level detail

Generator Technology Fuel Capacity Status Online
CBEP4 Solar Photovoltaic Solar 4 MW Operating 2,023

Generation trend

Monthly output pattern

131 MWh
Jan
478 MWh
Feb
707 MWh
Mar
873 MWh
Apr
1,067 MWh
May
1,073 MWh
Jun
516 MWh
Jul
851 MWh
Aug
815 MWh
Sep
698 MWh
Oct
490 MWh
Nov
243 MWh
Dec

Nearby plants

Closest comparison sites

Weld, Colorado

Gilcrest Sun CSG

Solar

Gilcrest Sun CSG is a solar plant in Weld, Colorado. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

2 MW 4,503 MWh 0 tons CO2
SunShare Management 2.4 mi away

Weld, Colorado

CBEP Solar 7

Solar

CBEP Solar 7 is a solar plant in Weld, Colorado. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

5 MW 3,357 MWh 0 tons CO2
Green Street Power Partners 2.7 mi away

Weld, Colorado

CBEP Solar 5, LLC

Solar

CBEP Solar 5, LLC is a solar plant in Weld, Colorado. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

5 MW 9,823 MWh 0 tons CO2
Green Street Power Partners 2.8 mi away

Weld, Colorado

Gilcrest V CSG

Solar

Gilcrest V CSG is a solar plant in Weld, Colorado. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

5 MW 9,913 MWh 0 tons CO2
SunShare Management 3.5 mi away

Related routes

Context around this plant