Electric generating plantEIA plant no. 60801

CEC Solar #1117, LLC

Type
Solar Photovoltaic
Nameplate capacity
1.5 MW
Units
1
In service since
2018
Operator
Altus Power America Management, LLC
Location
Pueblo, Pueblo County, Colorado
Rated 249th largest in Colorado · 12718th of 14,761 in the U.S. · by nameplate

CEC Solar #1117, LLC is a solar power plant in Colorado with a nameplate capacity of 1.5 MW. It generates roughly 7.2k MWh per year — enough to power about 687 average U.S. homes.

Its capacity factor of 55% puts it in the middle range — running steadily but not full-time.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, CEC Solar #1117, LLC could make 13.1k MWh. In 2023 it made 7.2k MWh — the same as running at full power 55 hours in every 100.

Nameplate, full year13.1k MWh1.5 MW × 8,760 hours
Actually generated7.2k MWhEPA eGRID, 2023 · ≈687 homes

Mid-meritCapacity factor 55%. It runs much of the time, but not all of it.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasCoalOilHydroelectricWindSolar

Location

AddressWilliam White Blvd & N 27th La
CityPueblo
CountyPueblo County
StateColorado
ZIP81001
Coordinates38.28442, -104.52395
OperatorAltus Power America Management, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
PUEB2Solar PhotovoltaicSolar1.5 MWOperating2018

Grid context

NERC RegionWECC
Balancing AuthorityPublic Service Company of Colorado

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Pueblo County

View all plants in Pueblo County →

Explore more