Central Antelope Dry Ranch C

☀ SolarIPP Non-CHP20 MW capacity

605th largest plant in California · 4596th nationally

Central Antelope Dry Ranch C is a solar power plant in California with a nameplate capacity of 20.0 MW. It generates roughly 28.8k MWh per year — enough to power about 2,746 average U.S. homes.

Its capacity factor of 16% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%16%
Peaking — intermittent or backup
Capacity20 MWnameplate
Annual Generation28.8k MWhEPA eGRID
Capacity Factor16%of theoretical max
Annual CO₂metric tons

Location

Plant NameCentral Antelope Dry Ranch C
OperatorAes Distributed Energy
CityLancaster
CountyLos Angeles County
StateCalifornia
ZIP93536
Coordinates34.72050, -118.30046

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Solar

Generators (1)

IDTechnologyFuelCapacityStatusOnline
CADRCSolar PhotovoltaicSolar20.0 MWOperating2016

Ownership

OwnerLocationShare
Central Antelope Dry Ranch C LlcSalt Lake City, UT10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants