Central Line Solar, Llc

☀ SolarIPP Non-CHP100 MW capacity

58th largest plant in Arizona · 2473rd nationally

Central Line Solar, Llc is a solar power plant in Arizona with a nameplate capacity of 100 MW. It generates roughly 263.7k MWh per year — enough to power about 25,116 average U.S. homes.

Its capacity factor of 30% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%30%
Peaking — intermittent or backup
Capacity100 MWnameplate
Annual Generation263.7k MWhEPA eGRID
Capacity Factor30%of theoretical max
Annual CO₂metric tons

Location

Plant NameCentral Line Solar, Llc
OperatorAes Distributed Energy
CityCoolidge
CountyPinal County
StateArizona
ZIP85131
Coordinates32.83432, -111.56803

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBattery Storage

Generators (1)

IDTechnologyFuelCapacityStatusOnline
CNTRLSolar PhotovoltaicSolar100 MWOperating2022

Grid context

NERC RegionWECC
Balancing AuthoritySalt River Project