Chillingham Storage is a battery storage power plant in Texas with a nameplate capacity of 150 MW.
The 150 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.
How it works
Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 7249 Shaw Rd. |
|---|---|
| City | Rogers |
| County | Bell County |
| State | Texas |
| ZIP | 76569 |
| Coordinates | 31.00530, -97.26319 |
| Operator | Chillingham Storage LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| CHILB | Batteries | Battery | 150 MW | Operating | 2025 |
| NERC Region | TRE |
|---|---|
| Balancing Authority | Electric Reliability Council of Texas, Inc. |
Battery storage facilities don't generate electricity — they store it. They charge from the grid (often from solar during the day) and discharge during peak demand or to firm up renewables. EIA classifies them as power plants because they connect to the grid like one.
| Data center | Distance |
|---|---|
| Data center, Temple | 4.2 mi |
| Data center, Temple | 10.7 mi |
| Data center, Temple | 10.8 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map