Chisum

☀ SolarIPP Non-CHP10 MW capacity

620th largest plant in Texas · 5651st nationally

Chisum is a solar power plant in Texas with a nameplate capacity of 10.0 MW. It generates roughly 21.9k MWh per year — enough to power about 2,085 average U.S. homes.

Its capacity factor of 25% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%25%
Peaking — intermittent or backup
Capacity10 MWnameplate
Annual Generation21.9k MWhEPA eGRID
Capacity Factor25%of theoretical max
Annual CO₂metric tons

Location

Plant NameChisum
OperatorCypress Creek Renewables
CityBlossom
CountyLamar County
StateTexas
ZIP75416
Coordinates33.63291, -95.39071

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBattery Storage

Generators (1)

IDTechnologyFuelCapacityStatusOnline
GEN1Solar PhotovoltaicSolar10.0 MWOperating2018

Grid context

NERC RegionTRE
Balancing AuthorityElectric Reliability Council Of Texas, Inc.