Electric generating plantEIA plant no. 60687

Cimarron Bend Wind Project I, LLC

Type
Onshore Wind Turbine
Nameplate capacity
200 MW
Units
1
In service since
2016
Operator
Cimarron Bend Wind Project I, LLC
Location
Minneola, Clark County, Kansas
Rated 34th largest in Kansas · 1574th of 14,761 in the U.S. · by nameplate

Cimarron Bend Wind Project I, LLC is a wind power plant in Kansas with a nameplate capacity of 200 MW. It generates roughly 800.9k MWh per year — enough to power about 76,277 average U.S. homes.

Its capacity factor of 46% puts it in the middle range — running steadily but not full-time.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Cimarron Bend Wind Project I, LLC could make 1.8M MWh. In 2023 it made 800.9k MWh — the same as running at full power 46 hours in every 100.

Nameplate, full year1.8M MWh200 MW × 8,760 hours
Actually generated800.9k MWhEPA eGRID, 2023 · ≈76,277 homes

Mid-meritCapacity factor 46%. It runs much of the time, but not all of it.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilWindSolar

Location

Address742 County Road H
CityMinneola
CountyClark County
StateKansas
ZIP67831
Coordinates37.35500, -99.99100
OperatorCimarron Bend Wind Project I, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
1Onshore Wind TurbineWind200 MWOperating2016

Grid context

NERC RegionMRO
Balancing AuthoritySouthwest Power Pool

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Clark County

View all plants in Clark County →

Explore more