Electric generating plantEIA plant no. 65465

Cinnaminson Landfill Solar

Type
Solar Photovoltaic
Nameplate capacity
10.0 MW
Units
1
In service since
2019
Operator
Public Service Elec & Gas Co
Location
Cinnaminson, Burlington County, New Jersey
Rated 67th largest in New Jersey · 6054th of 14,761 in the U.S. · by nameplate

Cinnaminson Landfill Solar is a solar power plant in New Jersey with a nameplate capacity of 10.0 MW. It generates roughly 17.1k MWh per year — enough to power about 1,631 average U.S. homes.

Its capacity factor of 20% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Cinnaminson Landfill Solar could make 87.6k MWh. In 2023 it made 17.1k MWh — the same as running at full power 20 hours in every 100.

Nameplate, full year87.6k MWh10.0 MW × 8,760 hours
Actually generated17.1k MWhEPA eGRID, 2023 · ≈1,631 homes

Peaking or variableCapacity factor 20%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilSolarBiomass

Location

Address1601 Taylors Lane
CityCinnaminson
CountyBurlington County
StateNew Jersey
ZIP08077
Coordinates40.01583, -74.98355
OperatorPublic Service Elec & Gas Co

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
CINNSolar PhotovoltaicSolar10.0 MWOperating2019

Grid context

NERC RegionRFC
Balancing AuthorityPJM Interconnection, LLC

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Burlington County

View all plants in Burlington County →

Explore more