City of Madera WWTP is a solar power plant in California with a nameplate capacity of 1.0 MW. It generates roughly 1.5k MWh per year — enough to power about 147 average U.S. homes.
Its capacity factor of 18% reflects intermittent or peaking operation.
Run flat out every hour of the year, City of Madera WWTP could make 8.8k MWh. In 2023 it made 1.5k MWh — the same as running at full power 18 hours in every 100.
Peaking or variableCapacity factor 18%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 13048 Road 21 1/2 |
|---|---|
| City | Madera |
| County | Madera County |
| State | California |
| ZIP | 93637 |
| Coordinates | 36.94080, -120.15720 |
| Operator | SunE GIL1, LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| 1 | Solar Photovoltaic | Solar | 1.0 MW | Operating | 2009 |
| NERC Region | WECC |
|---|---|
| Balancing Authority | California Independent System Operator |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.