Electric generating plantEIA plant no. 57570

Cooper Farms VW Project

Type
Onshore Wind Turbine
Nameplate capacity
4.5 MW
Units
1
In service since
2012
Operator
Cooper Hatchery Inc.
Location
Van Wert, Van Wert County, Ohio
Rated 138th largest in Ohio · 8794th of 14,761 in the U.S. · by nameplate

Cooper Farms VW Project is a wind power plant in Ohio with a nameplate capacity of 4.5 MW. It generates roughly 11.5k MWh per year — enough to power about 1,095 average U.S. homes.

Its capacity factor of 29% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Cooper Farms VW Project could make 39.4k MWh. In 2023 it made 11.5k MWh — the same as running at full power 29 hours in every 100.

Nameplate, full year39.4k MWh4.5 MW × 8,760 hours
Actually generated11.5k MWhEPA eGRID, 2023 · ≈1,095 homes

Peaking or variableCapacity factor 29%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricWindSolar

Location

Address6793 US Route 127 North
CityVan Wert
CountyVan Wert County
StateOhio
ZIP45891
Coordinates40.90583, -84.57028
OperatorCooper Hatchery Inc.

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
WTGOnshore Wind TurbineWind4.5 MWOperating2012

Grid context

NERC RegionRFC
Balancing AuthorityPJM Interconnection, LLC

About Wind plants