Copco 1 is retired. EIA's monthly generator inventory (EIA-860M, September 2026) lists every generator at this hydroelectric plant as retired; the last one retired in January 2024. It is not counted among California's operating plants or in any ranking on this site.
The figures below describe the plant when it ran: equipment from EIA Form 860 (2025), output and emissions from EPA eGRID (2023).
Run flat out every hour of the year, Copco 1 could make 175.2k MWh. In 2023 it made 71.4k MWh — the same as running at full power 41 hours in every 100.
Capacity factor 41% in 2023, before it retired.
How it works
Why the numbers look like this: output depends on how far the water falls and how much of it flows, so a hydro plant's year follows rain and snowmelt — and dam operators can hold water back for the hours when power is worth the most.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | Copco Rd, 20 Mi East of I5 |
|---|---|
| City | Hornbrook |
| County | Siskiyou County |
| State | California |
| ZIP | 96044 |
| Coordinates | 41.97891, -122.33532 |
| Operator | PacifiCorp |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| 1 | Conventional Hydroelectric | Water | 10.0 MW | Retired | 1918 |
| 2 | Conventional Hydroelectric | Water | 10.0 MW | Retired | 1918 |
| NERC Region | WECC |
|---|---|
| Balancing Authority | PacifiCorp - West |
Hydroelectric plants spin turbines using falling or flowing water — typically from a dam-impounded reservoir. They are dispatchable, long-lived, and emission-free at the point of generation, though large reservoirs can disrupt rivers and ecosystems and methane can be released from flooded vegetation.