Electric generating plantEIA plant no. 65174

Cranberry Highway Solar LLC

Type
Solar Photovoltaic
Nameplate capacity
4.2 MW
Units
2
In service since
2021
Operator
Cranberry Highway Solar, LLC
Location
Wareham, Plymouth County, Massachusetts
Rated 213th largest in Massachusetts · 8995th of 14,761 in the U.S. · by nameplate

Cranberry Highway Solar LLC is a solar power plant in Massachusetts with a nameplate capacity of 4.2 MW. It generates roughly 3.1k MWh per year — enough to power about 295 average U.S. homes.

Its capacity factor of 8% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Cranberry Highway Solar LLC could make 36.8k MWh. In 2023 it made 3.1k MWh — the same as running at full power 8 hours in every 100.

Nameplate, full year36.8k MWh4.2 MW × 8,760 hours
Actually generated3.1k MWhEPA eGRID, 2023 · ≈295 homes

Peaking or variableCapacity factor 8%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

WindSolarBiomassBattery Storage

Location

Address2382 Cranberry Highway
CityWareham
CountyPlymouth County
StateMassachusetts
ZIP02571
Coordinates41.78746, -70.74522
OperatorCranberry Highway Solar, LLC

Generators (2)

IDTechnologyFuelNameplate capacityStatusOnline
PV1Solar PhotovoltaicSolar2.2 MWOperating2021
BA1BatteriesBattery2.0 MWOperating2021

Grid context

NERC RegionNPCC
Balancing AuthorityISO New England Inc.

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Plymouth County

View all plants in Plymouth County →

Explore more