Electric generating plantEIA plant no. 10525

Craven County Wood Energy LP

Type
Wood/Wood Waste Biomass
Nameplate capacity
50.0 MW
Units
1
In service since
1990
Operator
CMS Generation Operating Co II
Location
New Bern, Craven County, North Carolina
Rated 80th largest in North Carolina · 3933rd of 14,761 in the U.S. · by nameplate

Craven County Wood Energy LP is a biomass power plant in North Carolina with a nameplate capacity of 50.0 MW. It generates roughly 309.7k MWh per year — enough to power about 29,491 average U.S. homes.

Its capacity factor of 71% puts it in the middle range — running steadily but not full-time. At 28 lb CO₂/MWh, its emission rate sits below the national grid average of roughly 800 lb/MWh.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Craven County Wood Energy LP could make 438.0k MWh. In 2023 it made 309.7k MWh — the same as running at full power 71 hours in every 100.

Nameplate, full year438.0k MWh50.0 MW × 8,760 hours
Actually generated309.7k MWhEPA eGRID, 2023 · ≈29,491 homes

Mid-meritCapacity factor 71%. It runs much of the time, but not all of it.

Month by month in 2025

100% of nameplate0Jan: 25.7k MWh (69% of capacity)JFeb: 22.6k MWh (67% of capacity)FMar: 27.5k MWh (74% of capacity)MApr: 15.6k MWh (43% of capacity)AMay: 27.9k MWh (75% of capacity)MJun: 27.6k MWh (77% of capacity)JJul: 26.8k MWh (72% of capacity)JAug: 23.7k MWh (64% of capacity)ASep: 26.7k MWh (74% of capacity)SOct: 16.3k MWh (44% of capacity)ONov: 22.6k MWh (63% of capacity)NDec: 21.4k MWh (58% of capacity)D

Pale bars are each month's ceiling (50.0 MW nameplate × hours in the month). Filled bars are actual net generation reported to EIA Form 923.

How it works

A steam plant burning wood

wood insteamwater returns1boiler burns wood2steam spins turbine3generator4cooling condenses steam
  1. A boiler burns wood to turn water into high-pressure steam.
  2. The steam pushes through a turbine, spinning it thousands of times a minute.
  3. The turbine's shaft turns a generator, which sends power to the grid.
  4. Spent steam is cooled back into water — by a cooling tower, a lake or a river — and pumped back to the boiler.

Why the numbers look like this: a boiler and turbine this size take hours to bring up from cold, so steam plants were built to run steadily for long stretches. A steam plant with a low capacity factor is usually being held in reserve, or run only through the hottest and coldest weeks.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

SolarBiomassBattery Storage

Location

Address201 Executive Parkway
CityNew Bern
CountyCraven County
StateNorth Carolina
ZIP28562
Coordinates35.13019, -77.16788
OperatorCMS Generation Operating Co II

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
1UNIWood/Wood Waste BiomassWood/Wood Waste50.0 MWOperating1990

Ownership

OwnerLocationShare
CMS Generation MI Power LLCDearborn, MI5000.0%
Atlantic Power CorporationDedham, MA5000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Emissions (annual)

CO₂4.3k metric tons
SO₂288 metric tons
NOₓ446 metric tons
CO₂ Rate28 lb/MWh
This plant28 lb/MWhU.S. grid average800 lb/MWhNatural gas combined-cycle average900 lb/MWhCoal plant average2,100 lb/MWh

Annual totals and CO₂ rate reported by EPA eGRID for 2023. Reference averages are approximate U.S.-wide figures from the same dataset.

Grid context

NERC RegionSERC
Balancing AuthorityDuke Energy Progress East

About Biomass plants

Biomass plants burn wood, agricultural waste, or methane from landfills to generate steam and electricity. They are considered carbon-neutral over long timescales when fuel is sustainably sourced, but they produce particulate emissions similar to coal.

Other plants in Craven County

View all plants in Craven County →

Explore more