Crockett Cogen Project

🔥 Natural GasIPP CHP247 MW capacity

102nd largest plant in California · 1272nd nationally

Crockett Cogen Project is a natural gas power plant in California with a nameplate capacity of 247 MW. It generates roughly 1.5M MWh per year — enough to power about 140,917 average U.S. homes.

Its capacity factor of 68% puts it in the middle range — running steadily but not full-time. At 700 lb CO₂/MWh, its emission rate sits below the national grid average of roughly 800 lb/MWh.

PeakingMid-meritBaseload0%40%80%100%68%
Mid-merit — steady but not full-time

Month by month in 2024

100% capacity0Jan: 131.2k MWh (71% of capacity)JFeb: 151.2k MWh (91% of capacity)FMar: 105.0k MWh (57% of capacity)MApr: 144.9k MWh (81% of capacity)AMay: 134.8k MWh (73% of capacity)MJun: 124.4k MWh (70% of capacity)JJul: 130.5k MWh (71% of capacity)JAug: 139.7k MWh (76% of capacity)ASep: 126.5k MWh (71% of capacity)SOct: 104.6k MWh (57% of capacity)ONov: 4.2k MWh (2% of capacity)NDec: 71.4k MWh (39% of capacity)D

Ghost bars are each month's theoretical maximum (247 MW nameplate × hours in the month). Filled bars are actual net generation reported to EIA Form 923. The gap between them is capacity factor made visible.

Capacity247 MWnameplate
Annual Generation1.5M MWhEPA eGRID
Capacity Factor68%of theoretical max
Annual CO₂517.5kmetric tons

Location

Plant NameCrockett Cogen Project
OperatorCrockett Cogeneration
CityCrockett
CountyContra Costa County
StateCalifornia
ZIP94525
Coordinates38.05690, -122.21610

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasWindSolarBiomass

Generators (1)

IDTechnologyFuelCapacityStatusOnline
GE1Natural Gas Fired Combined CycleNatural Gas247 MWOperating1995

Ownership

OwnerLocationShare
Eni Crockett LtdBethesda, MD9900.0%
Pacific Crockett Energy IncBethesda, MD100.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Emissions (annual)

CO₂517.5k metric tons
SO₂14 metric tons
NOₓ1.4k metric tons
CO₂ Rate700 lb/MWh
This plant699 lb/MWhU.S. grid average800 lb/MWhNatural gas combined-cycle average900 lb/MWhCoal plant average2,100 lb/MWh

Annual totals and CO₂ rate reported by EPA eGRID for 2023. Reference averages are approximate U.S.-wide figures from the same dataset.

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Natural Gas plants

Natural gas plants are the workhorse of the modern grid. Combined-cycle units achieve very high efficiency and can ramp up and down quickly to balance variable renewables. They emit roughly half the CO₂ per MWh of coal and far less of other pollutants, but they still release upstream methane during fuel extraction.

Other plants in Contra Costa County