Csu Sacramento I

☀ SolarIPP Non-CHP1 MW capacity

1598th largest plant in California · 12185th nationally

Csu Sacramento I is a solar power plant in California with a nameplate capacity of 1.3 MW.

Capacity1 MWnameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameCsu Sacramento I
OperatorBluepath Solar Sacramento I Llc
CitySacramento
CountySacramento County
StateCalifornia
ZIP95819
Coordinates38.55300, -121.42200

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBiomassBattery Storage

Generators (1)

IDTechnologyFuelCapacityStatusOnline
59211Solar PhotovoltaicSolar1.3 MWOperating2023

Grid context

NERC RegionWECC
Balancing AuthorityBalancing Authority Of Northern California

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Sacramento County

View all plants in Sacramento County →

Explore more