Electric generating plantEIA plant no. 67853

Delta Electronics Fremont

Type
Solar Photovoltaic
Nameplate capacity
1.0 MW
Units
2
In service since
2016–2020
Operator
Delta Electronics (Americas) Ltd
Location
Fremont, Alameda County, California
Rated 1777th largest in California · 13806th of 14,761 in the U.S. · by nameplate

Delta Electronics Fremont is a solar power plant in California with a nameplate capacity of 1.0 MW.

The 1.0 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilSolarBiomass

Location

Address46101 Fremont Blvd
CityFremont
CountyAlameda County
StateCalifornia
ZIP94538
Coordinates37.48963, -121.94900
OperatorDelta Electronics (Americas) Ltd

Generators (2)

IDTechnologyFuelNameplate capacityStatusOnline
PV1Solar PhotovoltaicSolar0.6 MWOperating2016
PV4Solar PhotovoltaicSolar0.4 MWOperating2020

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Alameda County

View all plants in Alameda County →

Data centers near Delta Electronics Fremont

Data centerOperatorDistance
Hurricane Electric Fremont 1Hurricane Electric1.0 mi
XO FremontXO1.8 mi
Hurricane Electric Fremont 2Hurricane Electric2.0 mi
PetadataNot recorded4.7 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more