Electric generating plantEIA plant no. 63947

DGS Valley State Prison

Type
Solar Photovoltaic
Nameplate capacity
2.3 MW
Units
1
In service since
2021
Operator
Forefront Power, LLC
Location
Chowchilla, Madera County, California
Rated 1362nd largest in California · 10829th of 14,761 in the U.S. · by nameplate

DGS Valley State Prison is a solar power plant in California with a nameplate capacity of 2.3 MW. It generates roughly 4.0k MWh per year — enough to power about 376 average U.S. homes.

Its capacity factor of 20% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, DGS Valley State Prison could make 20.1k MWh. In 2023 it made 4.0k MWh — the same as running at full power 20 hours in every 100.

Nameplate, full year20.1k MWh2.3 MW × 8,760 hours
Actually generated4.0k MWhEPA eGRID, 2023 · ≈376 homes

Peaking or variableCapacity factor 20%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBiomass

Location

Address21633 Avenue 24
CityChowchilla
CountyMadera County
StateCalifornia
ZIP93610
Coordinates37.10117, -120.15307
OperatorForefront Power, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
579Solar PhotovoltaicSolar2.3 MWOperating2021

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Madera County

View all plants in Madera County →

Explore more