District 70 Transco Gas Pipe Line is a other fossil power plant in Mississippi with a nameplate capacity of 1.6 MW.
The 1.6 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.
How it works
Why the numbers look like this: a boiler and turbine this size take hours to bring up from cold, so steam plants were built to run steadily for long stretches. A steam plant with a low capacity factor is usually being held in reserve, or run only through the hottest and coldest weeks.
| Address | 967 Hwy 583 |
|---|---|
| City | Tylertown |
| County | Walthall County |
| State | Mississippi |
| ZIP | 39667 |
| Coordinates | 31.24793, -90.19914 |
| Operator | Transcontinental Gas PL Corp |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| 001 | All Other | WH | 0.8 MW | Out of Service | 1951 |
| 002 | All Other | WH | 0.8 MW | Out of Service | 1951 |
| NERC Region | SERC |
|---|---|
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. |
District 70 Transco Gas Pipe Line is a federally registered power generation facility in Mississippi.