Division 2

☀ SolarIPP Non-CHP1 MW capacity

1705th largest plant in California · 12726th nationally

Division 2 is a solar power plant in California with a nameplate capacity of 1.0 MW. It generates roughly 1.1k MWh per year — enough to power about 108 average U.S. homes.

Its capacity factor of 13% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%13%
Peaking — intermittent or backup
Capacity1 MWnameplate
Annual Generation1.1k MWhEPA eGRID
Capacity Factor13%of theoretical max
Annual CO₂metric tons

Location

Plant NameDivision 2
OperatorTesla Inc.
CityLancaster
CountyLos Angeles County
StateCalifornia
ZIP93535
Coordinates34.70833, -118.13056

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

WindSolar

Generators (1)

IDTechnologyFuelCapacityStatusOnline
GEN 1Solar PhotovoltaicSolar1.0 MWOperating2014

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.