Dove Solar Csg

☀ SolarIPP Non-CHP5 MW capacity

138th largest plant in Colorado · 6987th nationally

Dove Solar Csg is a solar power plant in Colorado with a nameplate capacity of 5.0 MW.

Capacity5 MWnameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameDove Solar Csg
OperatorSunshare Management
CityJohnstown
CountyWeld County
StateColorado
ZIP80645
Coordinates40.31800, -104.89140

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBattery Storage

Generators (1)

IDTechnologyFuelCapacityStatusOnline
DOVESSolar PhotovoltaicSolar5.0 MWTesting

Grid context

NERC RegionWECC
Balancing AuthorityPublic Service Company Of Colorado

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Weld County

View all plants in Weld County →

Explore more